Epic Lifecycle

Every epic in OSTwin follows a deterministic state machine. The lifecycle defines which states are valid, what transitions are allowed, and what happens when things go wrong. This ensures that no epic gets stuck in an undefined state and every failure is handled systematically.

State Diagram

┌─────────────┐
│ planning │
└──────┬──────┘
┌──────▼──────┐
│ planned │
└──────┬──────┘
┌──────▼──────┐
│ ready │
└──────┬──────┘
┌──────▼──────┐
┌─────│ developing │◄────────────┐
│ └──────┬──────┘ │
│ │ │
│ ┌──────▼──────┐ │
│ │ review │ │
│ └──────┬──────┘ │
│ │ │
│ ┌─────┴─────┐ │
│ │ │ │
│ ┌────▼───┐ ┌────▼────┐ │
│ │ passed │ │ failed ├───────────┘
│ └────────┘ └────┬────┘ (retry)
│ │
│ ┌──────▼──────┐
│ │fixing │──► review
│ └─────────────┘
│ ┌──────────────┐
└────►│ blocked │
└──────┬───────┘
┌──────▼──────┐
│failed-final │
└─────────────┘

All 14 States

StateTerminalDescription
planningNoEpic is being decomposed into tasks by the manager
plannedNoTasks are defined, waiting for dependency gates to clear
readyNoAll dependencies satisfied, room can be created
developingNoEngineer is actively implementing tasks
reviewNoQA is reviewing the engineer’s deliverables
fixingNoEngineer is addressing QA feedback
passedYesQA approved, all acceptance criteria met
failedNoQA rejected, retry is possible
failed-finalYesMax retries exhausted, escalation required
blockedNoWaiting on external dependency or human input
timeoutNoExecution exceeded the configured time limit
escalatedNoSent to architect for design review
redesignNoArchitect determined a design change is needed
cancelledYesManually cancelled by the manager or user

Transition Mechanisms

State transitions are triggered by four mechanisms:

1. Agent Messages

The most common trigger. When an agent posts a done message, the room transitions from developing to review. When QA posts pass, it transitions to passed.

{"type":"done","from":"engineer"} → developing → review
{"type":"pass","from":"qa"} → review → passed
{"type":"fail","from":"qa"} → review → failed

2. Manager Orchestration

The manager controls lifecycle states that require cross-room awareness:

  • planning -> planned (after task decomposition)
  • planned -> ready (after dependency check)
  • failed -> developing (after retry decision)
  • failed -> failed-final (after max retries)

3. Timeout Enforcement

The system monitors execution time and forces transitions when limits are exceeded:

  • developing for > timeout_seconds -> timeout
  • timeout -> escalated (automatic)

4. Manual Override

Users can force state transitions through the dashboard or CLI:

Terminal window
Set-RoomStatus -RoomDir ".agents/war-rooms/room-042" -Status "cancelled"

lifecycle.json Format

Each war-room contains a lifecycle.json that defines its state machine:

{
"states": [
"planning", "planned", "ready", "developing",
"review", "fixing", "passed", "failed",
"failed-final", "blocked", "timeout",
"escalated", "redesign", "cancelled"
],
"initial": "planning",
"terminal": ["passed", "failed-final", "cancelled"],
"transitions": {
"planning": ["planned", "cancelled"],
"planned": ["ready", "blocked", "cancelled"],
"ready": ["developing", "blocked", "cancelled"],
"developing": ["review", "blocked", "timeout", "cancelled"],
"review": ["passed", "failed", "blocked", "cancelled"],
"failed": ["fixing", "failed-final", "escalated"],
"fixing": ["review", "blocked", "timeout"],
"timeout": ["escalated", "developing", "cancelled"],
"escalated": ["redesign", "developing", "failed-final"],
"redesign": ["developing", "cancelled"],
"blocked": ["developing", "cancelled"]
},
"manager_only": ["passed", "failed-final", "cancelled"]
}

Retry Logic

Failed epics are retried up to a configurable maximum:

ParameterDefaultDescription
max_retries3Maximum QA rejection cycles
timeout_seconds900Max execution time per attempt (15 minutes)
retry_delay_seconds0Delay between retry attempts

Escalation Flow

Attempt 1: develop → review → FAIL
Attempt 2: fix → review → FAIL
Attempt 3: fix → review → FAIL
failed-final → manager notified → architect escalation
├─► FIX verdict: architect provides guidance, retry
├─► REDESIGN verdict: epic restructured, restart
└─► REPLAN verdict: plan modified, DAG rebuilt

After the architect reviews, the manager receives one of three verdicts:

  • FIX — the implementation approach is sound, provide specific guidance
  • REDESIGN — the epic’s architecture needs changes before retry
  • REPLAN — the epic should be split, merged, or removed from the plan

Timeout Enforcement

The system tracks elapsed time for each non-terminal state:

Room entered "developing" at 2025-01-15T10:00:00Z
Timeout configured: 900 seconds
Current time: 2025-01-15T10:16:00Z
Elapsed: 960 seconds → TIMEOUT triggered

When a timeout fires:

  1. Room status transitions to timeout
  2. The manager is notified via the channel
  3. The manager decides whether to retry, escalate, or cancel
  4. If no action is taken within 300 seconds, auto-escalation occurs

Audit Trail

Every state transition is logged to lifecycle-audit.jsonl in the war-room:

{"ts":"2025-01-15T10:00:00Z","from":"planning","to":"planned","actor":"manager","reason":"Tasks decomposed"}
{"ts":"2025-01-15T10:00:05Z","from":"planned","to":"ready","actor":"system","reason":"Dependencies satisfied"}
{"ts":"2025-01-15T10:00:10Z","from":"ready","to":"developing","actor":"manager","reason":"Engineer assigned"}
{"ts":"2025-01-15T10:15:00Z","from":"developing","to":"review","actor":"engineer","reason":"TASK-001 done"}
{"ts":"2025-01-15T10:20:00Z","from":"review","to":"failed","actor":"qa","reason":"Test coverage 72%, required 95%"}
{"ts":"2025-01-15T10:20:05Z","from":"failed","to":"fixing","actor":"manager","reason":"Retry 1/3"}

This creates a complete, timestamped record of every lifecycle event for debugging and compliance.

Progress Tracking

Agents report progress through two complementary mechanisms:

progress.json

Machine-readable progress updated by agents via the report_progress MCP tool:

{
"percent": 65,
"message": "Implementing TASK-003 of 5. Tests passing for TASK-001 and TASK-002.",
"updated_at": "2025-01-15T10:12:00Z"
}

The percent field is clamped to 0-100 and drives the dashboard progress bars.

PROGRESS.md

Human-readable progress notes maintained by the engineer:

## Progress
- [x] TASK-001: Login endpoint (done, tests passing)
- [x] TASK-002: Token validation (done, tests passing)
- [ ] TASK-003: Rate limiting (in progress)
- [ ] TASK-004: Integration tests
- [ ] TASK-005: OpenAPI docs

Lifecycle Generation

The lifecycle can be customized per plan or per epic:

ScriptPurpose
engine/New-Lifecycle.ps1Generate default lifecycle.json
create-lifecycle skillCustom lifecycle from epic requirements
engine/Validate-Transition.ps1Check if a transition is valid

The create-lifecycle skill can generate specialized lifecycles for different epic types — for example, a “documentation” lifecycle might skip the QA review step entirely.

Key Source Files

FilePurpose
.agents/war-rooms/*/lifecycle.jsonPer-room state machine
.agents/war-rooms/*/status.txtCurrent state
.agents/war-rooms/*/progress.jsonCompletion tracking
engine/Set-RoomStatus.ps1Status transition with validation
engine/Watch-Timeouts.ps1Timeout enforcement loop
mcp_servers/warroom/Status and progress MCP tools